Opposition to the Sabal Trail pipeline may be having more widespread effects. The same day FERC told Sabal Trail to pay attention to karst limestone sinkhole opposition, Duke announced it wasn’t going to “modernize” that plant. Two days later, Sabal Trail told one of that opposition that it was considering moving its Suwannee River crossing upstream, that is, away from Duke’s Suwannee Plant, Coincidence?
Ivan Penn wrote for Tampa Bay Times 26 August 2014, In flip-flop, Duke Energy will buy existing power plant, not build one, Continue reading Duke withdraws Suwannee and Polk plant plans