Tag Archives: Algonquin Gas Transmission

Spectra already lost at FERC once; could also lose at NRC

FERC previously denied a Spectra pipeline, and now the Nuclear Regulatory Commission (NRC) may prevent one. After three months of asking, John Peconom of FERC divulged how many pipelines FERC had ever denied: two, of which one was for a pipeline from an LNG site in Providence, Rhode Island, proposed by KeySpan LNG, L.P. and Algonquin Gas Transmission LLC, and denied by FERC 5 July 2005. According to Spectra Energy:

Continue reading Spectra already lost at FERC once; could also lose at NRC

Keyspan LNG and Algonquin Pipeline denied by FERC

This is the denied application that John Peconom gave me:

KeySpan LNG, L.P. and Algonquin Gas Transmission LLC

KeySpan LNG, L.P. Docket Nos. CP04-223-000 and
CP04-293-000
Algonquin Gas Transmission LLC Docket No. CP04-358-000
ORDER DENYING AUTHORIZATION UNDER SECTION 3
AND DISMISSING CERTIFICATE APPLICATION
(Issued July 5, 2005)
  1. In this proceeding, KeySpan LNG, L.P. (KeySpan) requests authority under section3 of the Natural Gas Act to site, construct, and operate a liquefied natural gas (LNG) terminal at its existing LNG storage facility in the City of Providence, Rhode Island.1 In a related application, Algonquin Gas Transmission LLC (Algonquin) requests authority under section 7(c) of the Natural Gas Act to construct and operate 1.44 miles of 24-inch diameter pipeline in order to transport natural gas from KeySpan’s proposed terminal to Algonquin’s existing interstate pipeline system.2
  2. In essence, KeySpan is proposing Continue reading Keyspan LNG and Algonquin Pipeline denied by FERC

Orders Denying Certificates

Given months to find them, all FERC could come up with for orders denying certificates was for two liquid natural gas (LNG) facilities. Each did have an associated pipeline request, but neither was for a stand-alone pipeline application. I do thank John Peconom and Kevin Bowman for providing these documents. However, really, is this all there is?

I asked John Peconom of FERC for a list of denied pipeline applications at the Moultrie makeup Sabal Trail Open House 27 January 2014, and again after the Valdosta FERC Scoping Meeting 4 March 2014, and each time Peconom said he would get me a list, including the actual orders denying some pipelines. At the Moultrie FERC Scoping Meeting 5 March 2014, I pointed out to the hundred-or-so attendees that I still hadn’t gotten a list.

After the Moultrie meeting, Kevin Bowman of FERC gave me a slip of paper with this written on it:

Turtle Bayou Gas
CP10-481-000
June 2011

See separate post.

Then John Peconom of FERC sent me an email message with these two links in it: Continue reading Orders Denying Certificates