Tag Archives: FERC

Alternative routes by Sabal Trail to FERC last Friday

Transportation System Alternatives, Alabama, Georgia, Florida Two, not one, alternative routes, one bypassing Georgia through the Florida Panhandle, and the other through Tift County, Cook County, and Valdosta in Georgia.

Extracted from Sabal Trail’s one big PDF document, here is PDF and JPG of the overview map.

Transportation System Alternatives, Alabama, Georgia, Florida
Transportation System Alternatives, Alabama, Georgia, Florida, in Alternatives, by Sabal Trail Transmission, for FERC Docket No. PF14-1-000, 15 November 2013, converted by SpectraBusters
SABAL TRAIL PROJECT, DRAFT RESOURCE REPORT 10, Alternatives, FERC Docket No. PF14-1-000, Initial Pre-Filing Draft, November 2013
http://spectrabusters.org/ferc/pf14-1-sabal-trail-transmission/update-2013-11-15/draft-resource-report-10-alternatives/

-jsq

Detailed project overview map from Sabal Trail

Project Overview Map in General Project Description Spectra’s filing last Friday with FERC included this PDF overview map that shows more detailed context than was visible in the photographed versions we had before. JPEG image appended for convenience.

More maps will appear in the Draft Resource Report 1 page, extracted from SABAL TRAIL PROJECT, DRAFT RESOURCE REPORT 1, General Project Description, FERC Docket No. PF14-1-000, Initial Pre-Filing Draft, November 2013. Continue reading Detailed project overview map from Sabal Trail

Senator Bill Nelson directs FERC to respond

A Sumter County, Florida resident copied her U.S. Senators when she asked FERC to answer the questions Spectra won’t. Senator Bill Nelson directed FERC to answer.

Here’s the letter from Senator Bill Nelson to FERC:

NOV. 1.2013 1:37PM 4078727165 N0.4797 P. 2/4

PF14-1

United States Senate
WASHINGTON. DC 50510-0905
BILL NELSON
FLORIDA
November 1, 2013

Mr. Chris Murray
Director, Division of Governmental Aflairs Continue reading Senator Bill Nelson directs FERC to respond

Moratorium on Open House Meetings until everyone is notified –Carol Singletary

Received yesterday on FERC. If New York can protest a Spectra pipeline maybe we should, too. -jsq

Sabal Trail’s low profile approach to these meetings will keep our community uninformed and unprepared to meet the challenges of the proposed pipeline.

I received a letter that provided instructions on how to go find the meeting times. I found it interesting that a two page letter could be sent requesting authorization for the survey; however, Sabal Trail has made the task incumbent on the property owners to locate the information about these meetings.

Our entire community is impacted and notice has only been provided Continue reading Moratorium on Open House Meetings until everyone is notified –Carol Singletary

Pine trees, home sites, and pipeline rights of way –Tim Bland to FERC

Comment on FERC docket PF14-1 16 October 2013. Yes, if this pipeline is so safe and desirable, why can’t it go in public road rights of way? -jsq

Tim Bland, Valdosta, GA.

I am writing in regard to the construction of a new natural gas pipeline by Sable Trails/Spectra Energy, Docket #PF14-1. This proposed line will run right through the middle of my property located at 4801 Gary Lane in Valdosta, Georgia. The majority of the land that will be affected is planted in pine trees, which we use for the harvest and sale of pine straw and eventually the sale of the timber itself. Looking long-term, as a supplement for retirement, we have also considered subdividing this land into 5-acre tracks to sell for home sites.

South Georgia Natural Gas Company pipeline in south Lowndes County Georgia Sable trails is demanding that we sell them a 100′ easement right in the middle of this property, directly adjacent to an existing 50′ gas line easement owned by South Georgia Natural Gas. This will make 150′ right in the middle of our property that we will no longer be able to use for straw and timber harvesting. In addition, because of the route this line takes through our property, it will render this property useless for future home sites. This pipeline will have a direct negative affect on the income earning potential of this property for straw harvesting over the next 25-30 years as well at the long-term earning potential of timber harvesting and sale for home sites.

As I understand it, South Georgia Natural Gas bid on this pipeline project with intentions to place the new line within their existing easement. However they were out bid and now refuse to allow Sable Trails/Spectra to utilize the existing easement. Because of this, Continue reading Pine trees, home sites, and pipeline rights of way –Tim Bland to FERC

Non-Landowner stakeholders and agency permits –Sabal Trail

Yesterday Sabal Trail submitted to FERC a gold mine of contact information in the form of Updated Appendices C and D to the Public and Agency Participation Plan for the Sabal Trail Project under Docket No. PF14-1, submitted by Lisa A. Connolly.

Appendix C: Stakeholder List — Non-Landowners Federal, State and Local Agencies

This list includes the U.S. Army Corps of Engineers (USACE) in Mobile, Birmingham, Savannah, and Jackonville thhe U.S. Fish and Wildlife Service (USFWS) in Daphne, Alabama, in Atlanta, Townsend, and Fort Benning, Georgia, and in Vero Beach and Jacksonville, Florida, the EPA, NOAA, and numerous state offices in Alabama, Georgia, and Florida, and a long list of Indian tribes.

Appendix D: Agency Permits/Approvals

None of these are actually for permits yet; they’re all for process or consultation.. Agencies listed include FERC, EPA, USACE, USFWS, NOAA, a long list of federally recognized tribes, and state conservation, natural resources, transportation, wildlife, parks, and historic preservation agencies for Alabama, Georgia, and Florida, as well as quite a few TBD (to be determined) contacts for specific counties, including, surprisingly, Tift County, Georgia.

-jsq