Category Archives: Georgia

Sabal Trail solar and wind misinformation

A few weeks ago John Peconom of FERC referred me to Sabal Trail’s comments on solar power; something about all the area you’d have to clear to provide as much energy as that 36-inch pipeline. OK, I’ve looked, and it’s the same kind of disinformation Georgia Power used to spout about you’d need to clear an area the size of Atlanta to power Atlanta with solar power. Nevermind you already have an area that size: it’s called Atlanta! Rooftops, parking lots, streets, etc.: plenty of room. And Sabal Trail’s disinformation completely ignores that solar power (and wind) are growing far faster than methane energy production. If this is FERC’s justification for eminent domain to get fracked gas to Florida, it’s a very flimsy justification indeed. We shouldn’t expect anything more from a company that would profit by that eminent domain. But we should expect more from a tax-funded federal agency that is supposed to represent we the people.

Bear in mind that all new U.S. electric generation in September 2012 came from wind and solar. In October 2013 72.1% of all new U.S. capacity came from solar, according to the Solar Energy Industries Association (SEIA), using data from FERC itself. And FERC doesn’t even count the million solar rooftops that are going in.

In 10.3.3 Non-Gas Energy Alternatives in its Draft Resource Report 10: Alternatives (RR10), Sabal Trail correctly dismisses dirty and expensive coal, oil, and nuclear, and even hydro as major energy sources for flat Florida. However, what’s in there about wind and solar is just plain bogus. Continue reading Sabal Trail solar and wind misinformation

Chamblee, Georgia opposes a methane pipeline

Georgia City passes resolution against a methane pipeline, citing its duty to its own citizens as its highest priority. Other local governments could do the same. And that was for a proposed 24-inch pipeline; Spectra’s Sabal Trail proposes a 36-inch pipeline, for almost 3 and a half times as much gas and potential leaks and explosions. -jsq

Thomas S. Hogan, II, District 3, Chamblee City Council posted on his facebook page 20 Feb 2014 Chamblee Resolution Calls on the Members of the State Legislature to consider Changes:

WHEREAS, the Chamblee City Council holds its duty to protect its citizens as its highest priority; and

WHEREAS, on or around January 10, 2013, Atlanta Gas Light (AGL) began, in earnest, a construction project on Land Parcel 36, located at the end of a cul-de-sac on Shalimar Drive and between the 3200 Clairmont North Condominiums and Tanglewood Circle; also, directly under a main flight path of DeKalb-Peachtree Airport.; and

WHEREAS, on December 30, 2013 Land parcel 36 and the surrounding areas were annexed into the City of Chamblee; and

WHEREAS, the scope of the AGL construction project includes the installation of a 24-inch diameter 1080 psi steel pipeline reportedly tested at 720 psi to replace an existing 16-inch diameter 300 psi pipeline, and the addition of a new large gas regulator station/pigging station with a blast radius of up to 500 feet, according to the Pipeline Safety Trust Landowner’s Guide; and

WHEREAS, both the new regulator station and the larger pipeline are Continue reading Chamblee, Georgia opposes a methane pipeline

FERC Notice of Intent for Environmental Impact Statement and Scoping Meetings

Includes a list of Scoping Meetings in March 2014 (see SpectraBusters calendar), for all three pipelines: Transco Hillabee Expansion, Sabal Trail Transmission, and Florida Southeast Connection. On FERC’s website including PDF and Word used to produce the HTML below. -jsq

UNITED STATES OF AMERICA

FEDERAL ENERGY REGULATORY COMMISSION

Sabal Trail Transmission, LLC Docket Nos. PF14-1-000

Florida Southeast Connection, LLC PF14-2-000

Transcontinental Gas Pipe Line Company, LLC PF14-6-000

NOTICE OF INTENT TO PREPARE AN

ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED

SOUTHEAST MARKET PIPELINES PROJECT,

REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES,

AND NOTICE OF PUBLIC SCOPING MEETINGS


(February 18, 2014)

The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that discusses the environmental impacts of the planned Southeast Market Pipelines (SMP) Project. The SMP Project is comprised of three separate, but connected, natural gas transmission pipeline projects: Sabal Trail Transmission, LLC’s (Sabal Trail’s) Sabal Trail Project in Alabama, Georgia, and Florida; Florida Southeast Connection, LLC’s (FSC’s) Florida Southeast Connection Project (FSC Project) in Florida; and Transcontinental Gas Pipe Line Company, LLC’s (Transco’s) Hillabee Expansion Project in Alabama. The environmental impacts of all three projects will be considered in one EIS, which will be used by the Commission in its decision-making process to determine whether the SMP Project is in the public convenience and necessity.


This notice, which is being sent to Continue reading FERC Notice of Intent for Environmental Impact Statement and Scoping Meetings

Proposal will devalue property to be virtually worthless –James Ryder to FERC

Filed with FERC 14 February 2014. His #2 is basically the same question Susan Waller didn’t even want to hear: if the Sabal Trail pipeline won’t damage property values, why doesn’t Spectra buy up all the affected property and resell it later at a profit? -jsq

James Ryder, Tallahassee, FL.

We own a plot of land on Spain Lane in Brooks Co GA. My issue is that no matter what is logical, SPECTER, seems to be very narrow minded and due to eminent domain they do not seem to under stand that there proposal will devalue the already encumbered property (Sonat gas line and an electric easement) to the point that the property will be virtually worthless. The Solutions below are reasonable and should be considered.

Emailed to Dan Miller Spectra.

I have had a the opportunity to look over your recent proposal on the pipeline route. It looks a bit chaotic. Although it solve one problem, it creates several others. Your recent problem now runs pipe helter schelter all over the remaining property. I have attached a map and a description of a proposal that I think would solve all of our problems.

Solution 1: From the point of intersection of the SONAT gas pipe line Continue reading Proposal will devalue property to be virtually worthless –James Ryder to FERC

Watch Osceola County Commission live at 1:30 PM today

If you can’t get to Kissimmee today, you can watch it live on the Osceola County Commission’s website. And if you can’t get to that one, the pipelines are coming up at four other county commission meetings in Georgia and Florida from today through next week.

In addition to local landowner Monica Martin, she says the local Thai temple will also speak, Wat Florida Dhammaram, Theravāda Buddhist Temple.

And that’s not all:

Even many FPL allies oppose new methane pipelines, because of water, safety, health, fracking, property values, and other issues, and even county commissions in all three directly affected states (Lee County, Alabama started way back in May 2014) are having to respond to citizen concerns about unnecessary, environmentally damaging, and property-taking methane pipelines. Let’s go straight to solar and wind power!

-jsq

Lowndes County Commission Meeting and Protest

Protesting begins at 5:00 pm and the meeting will start at 5:30, Tuesday 11 February 2014. Residents can speak out during the “citizens wishing to be heard” section.

Sign up on the facebook event or come as you are.

Lowndes County Board of Commissioners 327 N. Ashley St – Commission Chambers, 2nd Floor Administration Building Valdosta, GA. Here’s the agenda.

And what has the county attorney been discussing about the Sabal Trail pipeline?

-jsq

Even many FPL allies oppose new methane pipelines

FPL and Spectra could lose, because many organizations and individuals don’t want dirty methane pipelines when we can go straight to conservation, efficiency, and solar and wind power.

Kevin Spear wrote for the Orlando Sentinel 19 January 2014 Pipeline to bring natural gas to state,

Florida Power & Light Co. is on the cusp of getting the pipeline it has long wanted to carry natural gas from elsewhere in the nation to Central and South Florida to run the utility’s power plants.

But the proposed $3.6 billion project, which FPL hopes to start using in 2017, has drawn mixed responses from even groups that are usually allies.

Among them, Audubon Florida lauds natural gas as cleaner than coal when burned by power plants, while Sierra Club Florida opposes the line as likely to ensure that the state becomes further addicted to the fuel at the expense of developing solar power.

Other negative reactions include:

  • Contention by many environmentalists that the use of natural gas on the whole — from drilling to consuming — is as damaging to the environment as the use of coal.
  • Concerns that the route of the proposed pipeline is potentially harmful to Florida wetlands and aquifers.
  • Criticism from some environmental groups that Continue reading Even many FPL allies oppose new methane pipelines

Colquitt County Commission on Sabal Trail pipeline today and tomorrow

Colquitt County is actively investigating legal options about the methane pipeline Spectra Energy wants to gouge through here. Other county attorneys could be as active.

Alan Mauldin wrote for The Moultrie Observer 8 February 2014, County commission meetings to focus on Sabal Trail pipeline,

Colquitt County Commission will receive updates Monday and Tuesday on a proposed natural gas pipeline that could pass through the county.

County Attorney Lester Castellow, who reently met with his counterparts from Brooks, Doughterty and Lowndes counties, is scheduled to address commissioners about the project during a Monday afternoon commission work session.

And representatives of Sabal Trail, the company that is building an Alabama-to-Florida gas pipeline will address commissoiners at Tuesday night’s commission meeting.

“Basically we’re going to be discussing what a local govermnent can and cannot do relative to the planning and construction of an interstate gas pipeline,” Castellow said during a Friday telephone interview.

It’s on the agenda for the 12 noon Monday 10 February 2014 Work Session:

3. Lester Castellow, County Attorney – Potential Options for Sabal Trail Natural Gas Pipeline

That’s at Room 261-C, Courthouse Annex, 101 East Central Avenue, Moultrie, GA 31768.

Colquitt County’s calendar doesn’t say when the Tuesday 11 February Regular Session will be, but the previous one was at 7PM. Presumably the Regular Session will have an agenda similar to the Work Session.

The newspaper story concludes: Continue reading Colquitt County Commission on Sabal Trail pipeline today and tomorrow

Farmer and lower income folks are people –James & Tracy Ryder to FERC

Filed with FERC 2 December 2013:

James & Tracy Ryder, Tallahassee, FL.

Sirs:

We have been contacted by Sabal Trail Transmission, LLC regarding their proposed natural gas pipeline. In their contacts with us, they requested permission to survey our property in reference to one of the proposed corridors since we are already encumbered with the SONAT pipeline that run through the middle of our property. We were told that we should sign the consent because they would use eminent domain to access our property against our will if need be. In a public meeting we were told they were putting in a 24″ line that would provide gas to mid and south Florida. We have later learned that they are intending to put in a 36″ line that would not serve Florida, but would provide for exports from Florida. Sabal Trail has not been providing accurate, or clear information to the public regarding these pipeline endeavors. When we asked about alternate corridors, we were told they would not consider the alternate corridor that was originally proposed due to the fact that there were many people impacted.

Seriously, Brooks County may be the home to many a farmer and lower income folks, but I assure they are people and don’t deserve to be exploited for the potential gains in revenue and exportation of our limited natural resources. Continue reading Farmer and lower income folks are people –James & Tracy Ryder to FERC

Dates and locations have not changed –Sabal Trail Transmission

Sabal Trail did all that was strictly required by FERC, so quit your whining, basically. The only new information is the list of newspapers STT used for advertising. People didn’t quit complaining, so later STT added a makeup meeting in Moultrie.

Filed with FERC 2 December 2013, Sabal Trail Transmission, LLC submits its Response to Comments Seeking Open House Meeting Information for the Sabal Trail Project under Docket No. PF14-1.

Sabal Trail Transmission, LLC 2701 N. Rocky Point Drive, Suit 1050 Tampa, FL

December 2, 2013

Ms. Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426

Re: Sabal Trail Transmission, LLC
Sabal Trail Project, Docket No. PF14-1-000
Response to Comments Seeking Open House Meeting Information

Dear Ms. Bose: Continue reading Dates and locations have not changed –Sabal Trail Transmission