Category Archives: Solar

FPL’s own projections don’t support need for a new pipeline

How does a 13% projected power increase justify a 33% 50% increase in fracked methane delivered by a third new pipeline? And why isn’t FPL doing more with solar power in the Sunshine State?

Updated 12 August 2014: Fixed 50% increase, which was so absurdly high that I didn’t believe it when I first wrote this. Yet 3/2 is a 50% increase.

FPL’s 10-Year Site Plan web page says:

FPL submitted its 10-Year Power Plant Site Plan 2014-2023 to the Florida Public Service Commission in April 2014.

The document includes on page 37 FPL’s own Schedule 2.1 History and Forecast of Energy Consumption And Number of Customers by Customer Class (Projected), which shows 55,739 GWh for 2014 and 62,870 GWh projected for 2023. That’s an increase of 13% over a decade. How does that (very aggressive) forecasted increase justify a natural gas increase of 33% 50% by adding a third pipeline? (And by the way, those numbers are significantly less than the numbers in FPL’s 2011 plan of Continue reading FPL’s own projections don’t support need for a new pipeline

Questions from SpectraBusters, Inc. to FERC

FERC’s ecomment system was malfunctioning, so Beth emailed this on behalf of the board, which unanimously approved it earlier that same day. She also forwarded it to John Peconom of FERC and to her U.S. Rep Ted Yoho (FL-03) and to Rep. Sanford Bishop (GA-02). Here is contact information for your elected officials and candidates. -jsq

From: Beth Gordon
To: efiling <efiling@ferc.gov>
Date: Sat, Apr 19, 2014 6:05 pm
Subject: PF14-1 Sabal Trail Pipeline

To Whom it may Concern at FERC:

I am the President of a group of citizens and landowners from Alabama, Georgia, and Florida affected by the Sabal Trail Pipeline. Here are some important questions we hope you will answer for us. We have had no answers from FERC representatives at any other time. These are the questions we would like answered:

  1. Is lack of justification of energy need by Florida sufficient for FERC staff to recommend denying a permit for the Sabal Trail pipeline? Continue reading Questions from SpectraBusters, Inc. to FERC

A Listening Session with Congressman Sanford Bishop

Received yesterday from one of the organizers. -jsq

A Listening Session
with Congressman Sanford Bishop

Thursday, April 17, 2014 at 10:00 AM
Room 100 of the Dougherty County Government Center
222 Pine Avenue
Albany, Georgia

Subject: Sabal Trail Transmission
Gas Pipeline Proposed Project

The session is being held to allow citizens to provide feedback and share concerns with the Congressman on the proposed Sabal Trail Transmission Gas Pipeline Project. This is a very significant concern for a variety of reasons, among them public safety, environmental and economic impact.

Congressman Bishop’s district covers most of the path of the proposed pipeline, making him a key ally in Congress to oppose the pipeline, if he can be convinced to do so. Continue reading A Listening Session with Congressman Sanford Bishop

Less cost, more jobs, and better health with sun, wind, and water power for Florida, or a dirty destructive methane pipeline?

How about we recognize every place is the worst place for the water-risking land-taking hazardous methane pipeline, and get on with sun, wind, and water to power Florida, Georgia, Alabama, and all the other states?

According to Stanford University researchers, we can do that, and we can do it 100% by 2050, using technology that’s already available. For Florida, that’s 20% rooftop solar PV (half residential and half commercial and governmental), 47.9% solar PV plants, 10% concentrating solar plants, 5% onshore wind, 15% offshore wind, 1% each wave and tide, 0.1% hydroelectric. So that’s 77.9% sun, 20% wind, 1% wave, 1% tide, and 0.1% hydro.

Requiring 0% nuclear, 0% coal, and 0% natural gas. That’s right, Florida doesn’t need methane to shut down coal and nukes. All the Sunshine State needs is sun, wind, and water.

With 355,500 construction jobs and 149,000 operation jobs, $20.1 billion or 3% of Florida’s GDP saved in avoided health costs, 2,210 Floridans not dead from air pollution.

Oh, and 42.9% less energy used over all, plus energy costs to customers cut more than in half.

Who are you going to believe? Researchers at Stanford who have no financial stake in the outcome? Or pipeline companies and utility companies that stand to profit from taking Continue reading Less cost, more jobs, and better health with sun, wind, and water power for Florida, or a dirty destructive methane pipeline?

Spectra CEO Greg Ebel excuses for lack of methane pipeline delivery

How does Spectra’s northern cold snap excuse for fracked gas apply to Florida, the target for the Sabal Trail, Hillabee, and Florida Southeast Connection methane pipelines? And if Spectra CEO Greg Ebel gets his wish to export gas, which T. Boone Pickens already explained will drive up domestic prices, how will higher gas prices help northern cities? Maybe Spectra’s pipelines aren’t for warming up cold houses; maybe they’re for corporate profit at the expense of landowners, taxpayers, ratepayers, and all those “natural” gas bus riders who will be surprised when their fares go up. Maybe we should stop the Sabal Trail pipeline and see if the fracking house of cards falls apart.

Jonathan Fahey wrote for AP 10 March 2014, Natural gas industry struggles to keep promises,

There’s plenty of natural gas in the ground, everyone seems to agree. But the harsh weather this winter shows there are obstacles to producing it, and more pipelines have to be built.

The bitter temperatures boosted demand for natural gas to heat homes and businesses. But wells in some places literally froze, making it difficult for some drillers to keep gas flowing. And the high demand clogged pipelines, so even when there was enough production, the gas couldn’t get where it needed to go.

Shortages cropped up, and prices in some places soared to record levels. Californians and Texans were asked to reduce their power consumption because utilities were running low on gas to run power plants. Montana State University in Billings had to cancel classes for a day because of a natural gas shortage.

Jim Fuquay amplified that chilly northern point for the Fort Worth Star-Telegram 11 March 2014:

Prices in New England briefly spiked to record levels. Californians were asked to reduce their power consumption because utilities were running low on gas to run power plants.

If the problem is cold weather in the north, why does Spectra want to build a pipeline to sunny Florida?

Curiously, the Star-Telegram omitted this point from the AP story; I’ve emphasized the redacted point: Continue reading Spectra CEO Greg Ebel excuses for lack of methane pipeline delivery

No Fracked Gas in Mass. allies with SpectraBusters

Another new ally added to the Allies page; today it’s No Fracked Gas in Mass., who bring us excellent tips on getting a resolution your local elected government’s agenda.


“Fighting Kinder Morgan/TGP’s Northeast Expansion across the Berkshires and Northern Massachusetts. Our mission is to reduce our reliance on fossil fuels and to create a comprehensive renewable energy infrastructure.”

They have an excellent post about getting resolutions on your town meeting agenda:

If you are thinking about bringing a non-binding resolution before your town meeting, time is running out. Each town has its own deadline for adding items to town meeting’s agenda and its own requirements for resolutions — in Cummington, we needed to gather just fifteen signatures and submit them to our town clerk for verification. Ask your select board members or your town clerk what the deadline is, and what the requirements are, for your town.

You can download the Cummington resolution to use as a model (here is a .txt version); if you are wondering what the point of a non-binding resolution is, please read this.

In Massachusetts select board members are what many other places call city council members. And many towns in Mass. make it easy for citizens to get resolutions on their agendas. Why should it be more difficult anywhere else? You can contact your Continue reading No Fracked Gas in Mass. allies with SpectraBusters

Sierra Club Chapters Oppose Sabal Trail Gas Pipeline

The nation’s oldest, largest, and most influential grassroots environmental organization opposes the Sabal Trail pipeline. Sierra Club PR today (and read to FERC):

TRI-STATE SIERRA CLUB CHAPTERS OPPOSE GAS PIPELINE

Statement of the Georgia, Florida, and Alabama Sierra Club
Chapters Opposing the Sabal Trail Pipeline

Tuesday, March 4, 2014

Contact:

Seth Gunning, Georgia Sierra Club, (404)-607-1262, seth.gunning@sierraclub.org
Bob Hastings, Alabama Sierra Club, bhastings@knology.net

ATLANTA, GA—The Georgia, Florida, and Alabama Chapters of the Sierra Club oppose the 650 mile Sabal Trail Transmission natural gas pipeline that would carry fracked natural gas extracted from Pennsylvania and Texas through Alabama, Georgia, and Florida. Sabal Trail Transmission, LLC is a joint venture between Spectra Energy Partners, LLC and and NextEra Energy, Inc. Spectra Energy and its related companies have been fined repeatedly for safety and environmental violations throughout the United States including one fine of $15,000,000.

The proposed pipeline would cut a wide swath through pristine lands with resulting negative impacts on endangered species, critical wildlife habitat, invaluable wetlands, Continue reading Sierra Club Chapters Oppose Sabal Trail Gas Pipeline

Pipeline Reader: Who, what, when, where, how, and why not the Sabal Trail methane pipeline

Here’s PDF of a reader for county commissions and others who need to get up to speed on the pipeline. Feel free to add local material for your county commission or city council.

This pipeline reader contains:

About the Pipeline

Sabal Trail Pipeline Context maps —Spectra Energy and FPL — Lowndes Area Knowledge Exchange www.l-a-k-e.org

Natural Gas Pipelines www.foodandwaterwatch.org

Spectra Safety Violations www.spectrabusters.org

Facts on Fracking — Wiregrass Activists for Clean Energy (WACE) www.wiregrassace.org/

Local Governments Can Restrict Pipelines www.spectrabusters.org

WV Polluter Files Bankruptcy www.spectrabusters.org

Stranded Fossil Fuel Assets www.spectrabusters.org

Solar Jobs — Lowndes Area Knowledge Exchange www.l-a-k-e.org

How to File a Comment with FERC

Continue reading Pipeline Reader: Who, what, when, where, how, and why not the Sabal Trail methane pipeline

Sabal Trail solar and wind misinformation

A few weeks ago John Peconom of FERC referred me to Sabal Trail’s comments on solar power; something about all the area you’d have to clear to provide as much energy as that 36-inch pipeline. OK, I’ve looked, and it’s the same kind of disinformation Georgia Power used to spout about you’d need to clear an area the size of Atlanta to power Atlanta with solar power. Nevermind you already have an area that size: it’s called Atlanta! Rooftops, parking lots, streets, etc.: plenty of room. And Sabal Trail’s disinformation completely ignores that solar power (and wind) are growing far faster than methane energy production. If this is FERC’s justification for eminent domain to get fracked gas to Florida, it’s a very flimsy justification indeed. We shouldn’t expect anything more from a company that would profit by that eminent domain. But we should expect more from a tax-funded federal agency that is supposed to represent we the people.

Bear in mind that all new U.S. electric generation in September 2012 came from wind and solar. In October 2013 72.1% of all new U.S. capacity came from solar, according to the Solar Energy Industries Association (SEIA), using data from FERC itself. And FERC doesn’t even count the million solar rooftops that are going in.

In 10.3.3 Non-Gas Energy Alternatives in its Draft Resource Report 10: Alternatives (RR10), Sabal Trail correctly dismisses dirty and expensive coal, oil, and nuclear, and even hydro as major energy sources for flat Florida. However, what’s in there about wind and solar is just plain bogus. Continue reading Sabal Trail solar and wind misinformation

Question the Sabal Trail pipeline in Osceola County 2014-02-10

Update: 10 Feb 2014: Watch it online or go to one of several other upcoming county commission meetings.

PDF

FOR IMMEDIATE RELEASE

Valdosta, 6 February 2014 — Local landowner Monica Martin will speak to the Osceola County Commission about the proposed Sabal Trail methane gas pipeline and its effects on the aquifer, native wildlife, and the landscape, plus property values and property rights. Other local citizens may also speak in the same "Hear the Audience" section (turn in a "Request to Speak" form before the meeting). Anyone from anywhere can come listen, or protest against the pipeline outside.

When:  1:30 PM
Monday, February 10
th 2014

Where: Administration Building 4 th Floor
One Courthouse Square
Kissimmee, Florida 34741
407-742-2000

Why: Spectra Energy, which had compressor station leaks in Maine last month and in Pennsylvania last year, plus multiple fines by Pipeline Hazardous Materials Safety Administration (PHMSA) for corrosion and leaks, and a record $15 million EPA fine for PCB contamination, proposes a hundred-foot-wide gash through our lands for their huge 36 inch Sabal Trail gas pipeline from Alabama through Georgia to feed Florida Power and Light (FPL) and Duke Energy for no benefit to local citizens and rate hikes for FPL customers. A one-time payment is not enough Continue reading Question the Sabal Trail pipeline in Osceola County 2014-02-10